08/23/2026
Video two of Chilly Day Quilting sewing studio build💙
Sorry it took awhile to get the outside photos of my quilt shop put together.
This has been a labor of love for sure.
We had a contractor build it for us from the start with concrete slab, stick built construction, foam insulation, drywall, and electrical.
My amazing youngest son laid all the LVP flooring for me, I painted the inside walls, and all the outside siding as well. That was a chore let me tell you.
All good things come with hard work and dedication, and a little love.
My husband would tell you it’s because I don’t like to sit still much, always needing my hands busy. 😍😍
It was completed January 2026 to a point we could then start bringing in all the quilting goodies. That will come in video 3 so stay tuned.
I was able to get the landscaping completed this summer, with sidewalk poured, river rock and some landscape plantings that deer will not eat. 😩
More to come💙 Chilly Day Quilting
Happy Quilting