Barrows Paving & Excavating

Barrows Paving & Excavating I grew up in Worcester working for my family's construction company. Went to Wentworth Institute of ex.

With my educations and background in the industry it gives me the leading edge advantage to complete your project in a timely fashion with the customers best needs in hand. We will do anything that has to do with excavtion even though we are a Paving Contractor. Stone and Asphalt Driveways, Sewer Connections and Repairs, Septic Systems and Repairs, Cellar Holes for new Foundations or Additions, and any type Site Work Job

1700 sf grade and pave 2” basecoat for this new construction duplex in Worcester. This included grading and paving the n...
06/26/2026

1700 sf grade and pave 2” basecoat for this new construction duplex in Worcester. This included grading and paving the new City sidewalk that will eventually be connected to the rest of this subdivision walkways.

3700 sf Grade and 2” basecoat of hot asphalt for this new construction home in Millbury
06/25/2026

3700 sf Grade and 2” basecoat of hot asphalt for this new construction home in Millbury

This new ADU project is a wrap for now until the frame is completed. We completed the excavation, backfilling, tied in t...
06/25/2026

This new ADU project is a wrap for now until the frame is completed. We completed the excavation, backfilling, tied in the existing wall to match the new foundation, underground water sleeve, underground plumbing, underground electrical, perimeter drain, and sonotube’s. Not sure if there is anything I May have missed but this was definitely a tight job. Everything hauled out and all structural material hauled back in. 5’ offset to the rear and right building setbacks and only 18’ between the front of the new ADU and the existing home. We will be back to touch everything up when it’s time to pour concrete slabs and the new asphalt driveway. We we completed the last few final touches this morning and as we were loading our last excavator out of the job lumber was arriving. Off to the next one!

Friend of ours is looking for a CDL driver if anyone is looking for a new job.
06/25/2026

Friend of ours is looking for a CDL driver if anyone is looking for a new job.

06/20/2026

Hammer time in Holden for Staruk, Incorporated

Last Monday we completed this emergency sewer repair in Worcester. These 2 three deckers off Shrewsbury St were connecte...
06/20/2026

Last Monday we completed this emergency sewer repair in Worcester. These 2 three deckers off Shrewsbury St were connected to a private Sewer main that was installed in 1889. Yes 1889! We redirected them from this old private main and connected them to the “Newer” 12” Draper main which was installed in 1894 in-front of these properties. One service was cored and booted into a brick manhole and the other we saddled the main with a rubber saddle and corded a hole in the existing main for the new service. In the midst of excavating we found a leaking iron gas service that was also installed in 1891 when these homes were built. Thank you A. J. Belcufine for the vac truck service on this project and David Eagan for the manhole core.

Beginning of last week we worked on Park hill Ave in Millbury to get the sewer and Water Laterals stubbed off the roadwa...
06/20/2026

Beginning of last week we worked on Park hill Ave in Millbury to get the sewer and Water Laterals stubbed off the roadway. The rest of this project will be completed in a couple of weeks with the 300’+ run to the new home soon to be built. Roadway was backfilled with flowable fill and the sewer for the home will have a E-One sewer injection system that only requires a 1 1/4” service that we ran into an existing sewer manhole. Thank you Dauphinais Concrete for the flowable fill and K&D Tap with the live 1” direct water tap.

Last Thursday afternoon and Friday we dug out the existing driveway at this home and expanded it on Malden St Worcester....
06/20/2026

Last Thursday afternoon and Friday we dug out the existing driveway at this home and expanded it on Malden St Worcester. We completed a 12”+ dig out, installed 12” gravel sub base, paved 2” basecoat, and paved 1 1/2” topcoat.

Ended the week with backfilling this ADU project. We installed a underground 2” PVC water sleeve from existing house int...
06/20/2026

Ended the week with backfilling this ADU project. We installed a underground 2” PVC water sleeve from existing house into the new ADU, sub graded for interior underground plumbing, Underground Electric, backfilled the interior foundation for concrete slabs, perimeter drain extension, and wall add on to meet the new foundation. Next week we will prep exterior slabs, remove excess fill, install sonotube’s, and final grade the driveway. Framing starts next Thursday!

Busy week starting off with this new home addition that wouldn’t work with the existing homes sewer line that left the p...
06/20/2026

Busy week starting off with this new home addition that wouldn’t work with the existing homes sewer line that left the property on the opposite end of the house which is a slab and has no basement. After completing the sewer we helped backfill some of the new foundation with our equipment along with hammering some very large rocks that were found on the site. We wrapped up this project by completing a 12” gravel sub base and paving a 2” basecoat of hot asphalt on their new driveway. Another job completed by Barrows Paving & Excavating & Staruk, Incorporated. On to the next one.

Address

Shrewsbury, MA
01545

Alerts

Be the first to know and let us send you an email when Barrows Paving & Excavating posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Barrows Paving & Excavating:

Share