2-Bedroom Unit Renovation.
Lounge.
Skimmed 2 coats of plaster over texture coat painted wall to make smooth, patched ceiling & installed piece of cornice where wall heater once existed.
Kitchen.
Remove ceiling exhaust fan, patched & flushed in kitchen ceiling.
Bathroom.
Removed a piece of cornice that had given way in bathroom, secured ceiling with extra screws & installed new piece of 55mm cornice. Bed 2.
Repaired ceiling crack in bedroom 2 ceiling by removing existing cotton tape & reflushed with paper tape.
Bed 1.
Replaced half of ceiling in bedroom 1 due to water leak, flushed & corniced where required to make good ready for painting.
Dining.
Repaired 2 cracks in ceiling between kitchen & dining, flushed to make good ready for painting.
Laundry.
Dividing wall between kitchen & laundry was removed, flushed patched ceiling, nib walls, power points & matched in texture paint on laundry ceiling. Installed new 55mm cornice where required to make good ready for painting.
July - August 2026. Ascot Pk.
Ultimate Homes and Renovations