VD&D Design & Project Management

VD&D Design & Project Management VDND Design & Project Management Structural, Civil, Building Designs, Project Management.

BDAA Accredited Building Designer #6801
The Institution of Engineers Australia
Structural
Residential Design
Mixed Commercial Design
Industrial and Warehouse
Building Design
Pool Design and Documentation

Civil
Land Development
Subdivisions
Roads
Earthworks
Pavements
Stormwater Drainage
Flood and Water Quality Studies
On-Site Stormwater Detention
Water Sensitive Urban Design (WSUD)
Wat

er Supply
Sewerage

Building Designs
Residential Dwellings
Terraces
Manor Houses
Dual Occupancy
Granny Flats
Pools
Alterations and Additions
Shop and Office Fitouts
Warehouses and Factories

Project Management
Due diligence Investigations
Feasibility studies
Design and Project Management
Tendering
Contract Administration
Superintendent Services
Budget Estimates

01/09/2026

🌍 CASTLE HILL 🌍

πŸ—οΈ PROJECT UPDATE | FRED CATERSON RESERVE

Great to be back on site representing VD&D Engineering, meeting with the development team to review the current construction progress and coordinate the next stages of this major sporting fields upgrade for The Hills Shire Council.

This is a significant community infrastructure project at Fred Caterson Reserve, Castle Hill, and one we’re proud to be providing structural engineering services for. Our structural documentation covers the proposed light poles, retaining structures and new amenities building.

The overall development includes 2 new full-size 100m Γ— 70m training fields, 1 new 100m Γ— 70m main playing field, a new amenities building, associated retaining and civil infrastructure, and 8 major sports lighting poles.

A major part of our engineering package is the structural design of the high-mast lighting foundations, including 32m-high poles to the main field and 30m-high poles to the training fields, supported on Ø1200 reinforced concrete bored piles founded into sandstone bedrock.

Site meetings like this are an important part of delivering projects of this scale β€” reviewing what has been completed, resolving construction matters with the team and making sure the upcoming works are properly coordinated before moving into the next stage.

From the drawing board to construction on site β€” it’s always rewarding seeing our engineering designs becoming reality.

Proud to be part of another project delivering long-term sporting and community infrastructure for Western Sydney. πŸ—οΈβš½οΈ

VD&D Design & Project Management
Structural Engineering | Civil Engineering | Building Design | Project Management

31/08/2026
31/08/2026

🌍 LILLI PILLI WATERFRONT 🌍

NEW PROJECT AWARDED | WATERFRONT 🏑🌊

We’re excited to announce that VD&D Design & Project Management has been appointed as the Structural Engineers for this incredible waterfront residence in Lilli Pilli, NSW.

Set on the shores of Great Turriell Bay, this grand project involves extensive alterations and additions to an existing multi-level residence, transforming the home while working with and around significant portions of the existing structure. The architectural documentation includes demolition, extensions and structural set-outs across multiple levels.

Our structural engineering involvement will include the careful assessment, design and integration of the new structural elements with the existing residence β€” one of the more challenging and rewarding aspects of major alteration and addition projects.

With a waterfront location, significant level changes and a complex existing structure, this is exactly the type of project where architecture and structural engineering need to work hand-in-hand to bring the design vision to life.

We’re proud to have been entrusted with the structural engineering for this impressive residence and look forward to working alongside the project team as 'Splendido' progresses from design through to construction.

Another exciting project added to the VD&D portfolio.

VD&D DESIGN & PROJECT MANAGEMENT
Building Design | Structural Engineering | Civil Engineering | Project Management

πŸ“ Lilli Pilli, NSW

VDND_Design

✝️ Sveta Velika Gospa ✝️The Feast of the Assumption of the Blessed Virgin Mary
15/08/2026

✝️ Sveta Velika Gospa ✝️

The Feast of the Assumption of the Blessed Virgin Mary

24/07/2026

🌍 HILLSDALE 🌍

‼️ ABSORPTION TRENCHES ‼️

Another successful site inspection as this project continues to progress smoothly.

Today we inspected the front section of the absorption trenches, marking the final stage of the external civil stormwater works.

Due to the site's challenging conditions and highly sandy soils, the stormwater management system was designed with two absorption trenches (infiltration systems) to effectively manage on-site stormwater runoff.

The project is now nearing completion, with only the driveway and landscaping remaining before handover.

A great effort by the builder and all consultants involved in delivering another quality project.

Engineering practical solutions. Delivering compliant outcomes.

VDND_Design

16/07/2026

🌍 MAROUBRA 🌍

‼️ DUAL OCCUPANCY – FIRST FLOOR & ROOF TIMBER FRAMING INSPECTION ‼️

Construction is progressing well on our dual occupancy development, with our structural engineering team completing detailed on-site inspections of the first floor and roof timber framing prior to the next stage of construction.

Our inspection confirms that the structural framing has been installed in accordance with the approved structural documentation, while verifying that all bracing, tie-downs, straps, bolts, connectors and fixings comply with the relevant Australian Standards and manufacturer requirements.

At this stage, we are confirming:
βœ”οΈ Timber framing members are installed in the correct locations and orientation
βœ”οΈ Strap bracing and structural plywood bracing are installed as detailed
βœ”οΈ Tie-downs, bolts, anchors and framing connections comply with the structural design
βœ”οΈ Structural tolerances are within acceptable limits
βœ”οΈ Roof framing is adequately restrained and braced
βœ”οΈ The structure is capable of performing under wind, gravity and lateral loading in accordance with the design intent

Thorough structural inspections throughout construction are essential to ensuring the building is safe, compliant and built to the highest standard, providing long-term performance and durability for the future occupants.

We're looking forward to sharing the completed project soon.


15/07/2026

🌍 SYDNEY 🌍

‼️ 20-DAY DA APPROVAL – CITY OF SYDNEY COUNCIL ‼️

🏒 COMMERCIAL TENANCY FITOUT 🏒

Another successful outcome for our team.

Our Building Design and Project Management teams successfully delivered the design, consultant coordination, and documentation for this commercial tenancy fitout, achieving full compliance with the NCC and all relevant Australian Standards.

The proposal included additional office spaces and internal modifications. Following lodgement with the City of Sydney Council, Development Approval (DA) was issued in just 20 days.

βœ… 20-Day Approval
βœ… No Council Comments
βœ… No Requests for Information (RFIs)
βœ… Smooth Approval Process

If you know, you know…

From concept to approval, we manage the entire process:

β€’ Building Design
β€’ Project Management
β€’ Cost Summary Report
β€’ Town Planning
β€’ Heritage Consultant
β€’ Electrical Engineering
β€’ Mechanical Engineering
β€’ Fire Services Engineering
β€’ Waste Management Plan
β€’ DA Application & Supporting Documentation
β€’ NSW Planning Portal Lodgement

One team. One point of contact. A seamless approval process.

The next stage is the preparation of the Construction Certificate (CC) documentation, allowing the project to move towards construction.


10/07/2026

🌍 CASTLE HILL 🌍

‼️ Sporting Fields, Amenities Building & Sports Lighting Development ‼️

Construction is well underway on our new sporting fields development for The Hills Shire Council. The project comprises two full-size training fields, one main competition field, a new amenities building incorporating change rooms, public amenities, a canteen and storage facilities, together with sports lighting infrastructure throughout the complex.

With the bulk earthworks now complete, construction has progressed to the amenities building, where the ground floor reinforced concrete slab is currently being formed and reinforced in preparation for the concrete pour.

Our structural engineering team has been on site carrying out detailed inspections of all reinforcement, including edge beams, internal beams, slab thickenings, step-downs, starter bars, hold-down bolts, and other critical structural elements.

These inspections verify that all reinforcement has been installed in accordance with the approved structural documentation, specified concrete cover requirements have been achieved, reinforcement detailing is correct, and the slab is fully prepared for a successful concrete pour.

At this stage, our inspections are focused on confirming:

βœ”οΈ Reinforcement has been installed in accordance with the structural drawings.

βœ”οΈ Concrete cover and reinforcement spacing comply with the relevant Australian Standards.

βœ”οΈ Beam reinforcement, slab thickenings, step-downs, and embedded elements are correctly positioned.

βœ”οΈ The slab is ready for concrete placement and long-term structural performance.

This marks another significant milestone for the project, achieved through the strong collaboration between the client, builder, contractors, and our structural engineering team.

We look forward to seeing the slab poured and progressing into the next phase of construction. πŸ—οΈ


02/07/2026

🌍 OATLEY 🌍

‼️ Raft Waffle Pod Slab – Single-Storey Dwelling Construction Update ‼️

Construction is progressing well on our new single-storey residential dwelling, with the team currently completing the ground floor raft waffle pod slab.

Reinforcement placement, beam cages, drop edge beams, internal beams, and formwork are now being finalised in preparation for the concrete pour.

Our structural engineering team has been on site carrying out detailed inspections of all reinforcement, including edge beams, drop edge beams, internal beams, step-downs, slab thickenings, and other critical load-bearing elements throughout the slab.

These inspections verify that all reinforcement has been installed in accordance with the approved structural documentation, specified concrete cover requirements have been achieved, beam layouts and reinforcement detailing are correct, and the slab is fully prepared for a successful concrete pour.

At this stage, our inspections are focused on confirming:

βœ”οΈ Reinforcement has been installed in accordance with the structural drawings.
βœ”οΈ Concrete cover and reinforcement spacing comply with Australian Standards.
βœ”οΈ Beam cages, slab thickenings, and step-downs are correctly detailed and positioned.
βœ”οΈ The raft slab is ready for concrete placement and long-term structural performance.

Another major milestone has been delivered through strong collaboration between the builder, contractor, and our structural engineering team.

We look forward to seeing the slab poured and progressing to the next stage of construction. πŸ—οΈ


Address

Bella Vista, NSW
2153

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+61401886580

Alerts

Be the first to know and let us send you an email when VD&D Design & Project Management posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share